I don't recall much of Monday's activities, except that I spent a part of it arranging the computer lab and getting the Smart Board hooked up to the presenter's iMac.
Tuesday - I took the day off
Wednesday - Went to the office to help set up for workshops. Took a call from an area tech about a weird email problem that appeared to a virus outbreak or a worm. then headed to Texarkana to troubleshoot/swap-out a computer that has reached its end of life. On my way there, I called the tech back with a few ideas (maybe the user's home computer was infecting email through Outlook Live? Maybe not). When I got back to the office, I sent out a message to the area techs and Supts about a survey they are to take in order to evaluate my performance and relevance. The co-op staff have their survey for the same purpose, so I emailed the link to that, too. I took a trip through the spam filter to release any mismarked emails. I also talked to the local cable company about getting service for our building. Turns out I have to make an in-person visit because we fall under "special services." I am hoping to do that on Friday.
Thursday, Video-Reality came down and installed projectors in the conference rooms and the DL lab. The DL Lab ceiling did not have a finished power outlet, so thankfully our electrician showed up to install one. Unfortunately, we didn't leave the building until almost 5:30 this evening.
I talked to the fire alarm folks about putting together a contact list and to discuss the phone-related issue we are having. That seems to be traced to the elevator room, so hopefully that will be fixed soon.
I spent the bulk of the afternoon working on the Sympodium and DL Equipment in the conference rooms. There were a LOT of wires we had attached to that thing from the old building. I traced each wire and eliminated all the ones we were not going to need. On Friday, I plan to continue that process and get everything hooked up to the new projector.
No comments:
Post a Comment