Drove straight to McRae Middle School to deliver several boxes of binders and books for a workshop taking place there today.
At the office, I talked with the presenter for a pocket camera workshop and we needed to update the software on the cameras being used. So, me and the DL coordinator and the presenter fired up Windows in Parallels and installed the correct software.
After that, Trish (DL Coordinator) and I headed to Bradley. in Bradley, we connected a new swicth and media converters to the video network in preparation for new equipment coming through an RUS grant. Once that was done, we went to the closet where the fiber terminated to install another media converter and switch. This allows for the video system to come online and for 24 computers to be installed in the new dl room.
After that, we went to an extsing dl room in order to disassemble a video system in order to reconfigure the hardware arrangement. The remote for the system would not work because the equipment had been installed backward in the podium. We fixed that, ran a couple test calls, and tied up loose wires, etc.
In the next dl room, we tied up loose wires and verified that things were working. The touch panel is having issues and we may need to update the software in both the codec and the touch panel this year.
There were three netbooks giving the local tech fits, so I helped get those situated and joined them to the domain.
I am scheduled to return on Tuesday with a Windows 7 DVD to reinstall software on a laptop and to run cabling for the new dl room.