Wednesday, March 28, 2012

3/28/2012

Drove to Texarkana Schools.

Connected Etherscope to network at main admin building. Started the network scan.

Took part in a conference call regarding TXK's plan to revamp their MAN.

Checked Etherscope, showed techs some of the features/reports.

Went to Arkansas High, scanned the LAN and did a wireless walkthrough. We decided to run three sessions: 1) Jacked in to regular switch port, 2) Jacked into port just inside DMZ, 3) Jacked into a mirrored port on main switch.  Saved reports for each test.

Had to run to the ECH at Washington Elem.  Worked on her computer. Also ran Etherscope test on that network since I was there.

At office, unboxed Fortinet firewall.  Swapped out lamp in computer lab.

Just found out that some of our conduit may have been torn up. Going to check on that. Yoy.