Monday - took the Etherscope to Fouke. Their network looked pretty good! They had some IPX traffic (printers) that we got under control and our walkthrough of the wireless network found a mobile hotspot and a Nintendo handheld device.
Tuesday - Took the Etherscope to Hope Schools. We found several issues - some duplicate IPs, some IPX traffic (mostly printers), a few others. Spent the day working on those plus some other issues and topics - iPads, New Tech school, new administration, various Mac OS apps, etc.
This site serves as public record of my activities as Technology Coordinator for Southwest Arkansas Education Co-op. This site will be used in conjunction with travel forms, calendars, minutes and other pertinent data, when used together, to build a robust view of the services I perform which help my main office, participating school districts, statewide initiatives, and the furthering of K12 education in Arkansas.
Showing posts with label hope. Show all posts
Showing posts with label hope. Show all posts
Tuesday, February 28, 2012
Monday and Tuesday (2/27 and 2/28)
Monday, November 28, 2011
Week of 11-28-2011
Monday - In the office. I answered voice mail and email from the previous week. I ran out to the Hope early childhood program to troubleshoot a computer problem. Turned out the maintenance folks had cleaned over the holiday break and knocked the power cord loose on a video distribution box. I employed the help of the DL Coordinator and we updated printer drivers in the APSCN mini lab. I worked with our bookkeeper to locate various items requested on the auditor inventory pull (three servers, an Opscan scanner, a projector, and a partridge in a pear tree.... Sorry, couldn't resist the holiday spirit there! I have talked with no fewer than three vendors and I shared the USAC E-Rate Window announcement via Twitter and FaceBook. I helped a staff member point her home page to the company's new website address. As this post was created at 10:30am on Monday, there is still a full day of tech ahead. This post may or may not be updated to reflect everything done today (hopefully, I will!!).
A few of our DTU-16D's have been acting a bit weird - namely, when an internal extension pages directly to certain phones, a loud buzzing sound could be heard in the background. After swapping units, I narrowed the issue down to the base/handset itself. Luckily, I have a couple left from the old building and took care of the main users with the issue. I have a repair/exchange in place for the two phones, so that should be fixed when I get back into the office next week.
Tuesday - OUT
Wednesday-Friday - I will be at the AESA National Conference in Colorado. I will be co-presenting with Harry Dickens in one session and helping to man the technology for Phoebe in another session. I will also be attending various breakout sessions, including the 2011 Digital Jam hosted by Kevin Honeycutt. I will be posting updates to twitter (@davidinark), FaceBook, and at least one of my personal blogs (http://www.poppedinmyhead.com).
A few of our DTU-16D's have been acting a bit weird - namely, when an internal extension pages directly to certain phones, a loud buzzing sound could be heard in the background. After swapping units, I narrowed the issue down to the base/handset itself. Luckily, I have a couple left from the old building and took care of the main users with the issue. I have a repair/exchange in place for the two phones, so that should be fixed when I get back into the office next week.
Tuesday - OUT
Wednesday-Friday - I will be at the AESA National Conference in Colorado. I will be co-presenting with Harry Dickens in one session and helping to man the technology for Phoebe in another session. I will also be attending various breakout sessions, including the 2011 Digital Jam hosted by Kevin Honeycutt. I will be posting updates to twitter (@davidinark), FaceBook, and at least one of my personal blogs (http://www.poppedinmyhead.com).
Tuesday, November 22, 2011
Moodle Monday
Phoebe asked me to generate a list of TIE modules with their authors/editors as we move into a new phase for the TIE program. The modules will be retooled for a hybrid environment using the Moodle CMS program.
Last Friday, I installed Moodle on a server we have and then I spent time on Monday working out kinks. The main one being mail delivery (or the lack thereof). I installed Moodle on a Windows server. The included mail subsystems with Moodle would not play nice with our Google Apps account. So, I finally managed to get that working after quite a bot of tinkering with ini files and php configs. I do need to make a couple of tweaks for security, but that should be a simple doing compared to the hoops I had to jump through in order to get mail working.
I suppose there are more effective ways to get mail delivery working, but my way works and I could not find a comprehensive solution online. I wrote up my solution and posted it to our locally held techblog: techblog.k12.ar.us
I also made a tech support visit to the early childhood program in Hope. Not sure what was going on, but they had intermittent Internet connectivity issues. Possibly weather related.
Tuesday, I have a presentation project to finish for Phoebe. I also have a phone call with George Lieux scheduled for the morning regarding the new direction of TIE, and possibly a call with Harry Dickens and Kevin Honeycutt regarding the upcoming AESA conference.
The offices are closed Wed-Fri for Thanksgiving.
Monday, September 12, 2011
Catching up... again.
Monday, August 29 - OUT
Tuesday, August 30 - Attended the "Get Motivated" seminar at Verizon Arena
Wednesday, August 31 - OUT
Thursday, September 1 - Blevins schools, worked on several server issues, workstation issues, networking issues all day
Friday, September 2 -
Monday - September 5 - Office Closed for Labor Day
Tuesday, September 6 - State tech meeting at Arch Ford Co-op
Wednesday, September 7 - Office and then to Hope Schools to help with conversion from Exchange to Google Docs, discuss iPad implementation, then office in afternoon to troubleshoot local network issues.
Thursday, September 8 - Help set up for a workshop at co-op. At 1030am, vendor shows up to install/connect new 6 Meg IMA! After brief delay, 6 Meg IMA up and running after lunch. Reconfigured local network and performed other troubleshooting tasks at co-op.
Friday, September 9 - OUT, though came in to office for a bit in order to restore connectivity to APSCN printer following the reconfiguration from the previous day.
Tuesday, August 30 - Attended the "Get Motivated" seminar at Verizon Arena
Wednesday, August 31 - OUT
Thursday, September 1 - Blevins schools, worked on several server issues, workstation issues, networking issues all day
Friday, September 2 -
Monday - September 5 - Office Closed for Labor Day
Tuesday, September 6 - State tech meeting at Arch Ford Co-op
Wednesday, September 7 - Office and then to Hope Schools to help with conversion from Exchange to Google Docs, discuss iPad implementation, then office in afternoon to troubleshoot local network issues.
Thursday, September 8 - Help set up for a workshop at co-op. At 1030am, vendor shows up to install/connect new 6 Meg IMA! After brief delay, 6 Meg IMA up and running after lunch. Reconfigured local network and performed other troubleshooting tasks at co-op.
Friday, September 9 - OUT, though came in to office for a bit in order to restore connectivity to APSCN printer following the reconfiguration from the previous day.
Subscribe to:
Posts (Atom)